D-1
Install or Replace Signs
D
Follow these steps in this appendix to install signs onto the charging station. To ensure a proper fit, signs must
follow the specification provided by ChargePoint. An example of the sign specification (not to scale) is provided
below. Detailed sign specifications are available at www.chargepoint.com/support-guides/. To ensure a proper fit,
a replacement sign must be a maximum of 1 mm thick and must be 102 mm wide (length will depend on whether
you are installing a sign on the front of the pedestal or on the cord management kit as well as which version of the
cord management kit you are installing).
Installing a Front Sign on a Pedestal
It is easier to install the sign before installing the head assembly, but it can be installed with the head assembly
already in place. Follow these steps to install the sign with the head assembly in place. If the head assembly is not
installed, the installation steps are the same, with the exception of inserting the top edge of the sign under the
bottom lip of the head assembly.
•
Remove the tape from the adhesive strip on the back of the sign.
•
With the adhesive strip facing toward the pedestal, insert the top left corner of the sign under the groove on
the top left corner of the pedestal, sliding the sign upwards as far as possible to position the top of the sign
under the bottom lip of the head assembly.
•
Starting with the top left corner and working from top to bottom, use a thumb or finger to slide the left side
of the sign under the pedestal’s leftmost groove.
•
When the left side of the sign is fully inserted, bow the top of the sign outward slightly to insert the top right
corner of the sign under the groove on the top right corner of the pedestal, ensuring the top of sign remains
positioned under the bottom lip of the head assembly.
•
Starting with the top right corner and working from top to bottom, use your thumb or finger to slide the right
side of the sign under the pedestal’s rightmost groove.
•
When the sign is fully inserted into the pedestal’s left and right grooves, and under the bottom lip of the head
assembly, run your hand down the center of the sign while applying enough pressure to make sure the sign’s
adhesive strip contacts the pedestal.