Step 3: Complete the Post-Installation Checklist
Before leaving the installation site, complete this checklist for the CPF25. Then provide this information, along
with the information on the previous page, to the person responsible for activating the CPF25.
Customer:
Name
Site Address
Contact
Installer:
Company
Address
Phone
Installer
Contact
Earth ground connection is made to the ground lugs (where applicable).
Service wiring has been fully inserted into the terminal block and all electrical connections are clean and snug.
Electrical enclosures are clean and free of wire strands and metal shavings.
All covers are installed and all fasteners are tightened.
The LED located at the bottom of the ChargePoint Gateway is solid green (this can take up to 10 minutes).
The parking area is clean and free of all packaging and debris.
All pinpointing steps on the previous page have been complete.
A white light is displaying around the CPF25’s connector dock and its WiFi LED, located on the left side of the
main unit’s cover, is solid green (this can take up to 10 minutes).
SHARED CIRCUITS ONLY: Specify panel & breaker numbers and apply spare activation labels below:
Panel ID #: ________________________ Breaker # ________________________