
Install Bracket and CMK
3-3
3.1 Single Station (no Cord Management)
1.
Remove the ground lug using a 7/16” wrench (save the 1/4”x20 screws
to reinstall).
2.
Connect the ground wire from the service wiring to the ground lug, then
run a 10-gauge ground wire from the ground lug through the wiring
opening in front of the pedestal.
3.
Reinstall the ground lug to the pedestal using the 7/16” wrench and the
two 1/4”x20 screws you removed.
4.
Run the remaining service wiring through the opening in front of the
pedestal.
5.
Slide the bracket over the pedestal. The two holes at the top and two
holes at the bottom of the bracket must align with the corresponding
holes in the pedestal.
CAUTION: The bracket must slide over the service wiring. Lay the wiring
as flat as possible to prevent the wires from damage.