NOTE:
Secure the connecting cable plugs using the safety clamps.
After connecting all columns plug MCB into wall outlet. Recheck all electrical connections.
Once the main switch is turned on, the lift is ready for operation.
1
P
Connecting Cable
Power Supply Unit
2 Dummy Plug
Control Unit
C
3 Main Plug (NOT included)
Input Terminal
IN
Output
Terminal OUT
CLM16
IOM.
DOC
5/8/09
Summary of Contents for CLM16
Page 10: ...Specifications CLM16 IOM DOC 5 8 09...
Page 21: ...SMA 2H Standard Carriage Wide Body Carriage CLM16 IOM DOC 5 8 09...
Page 22: ...SMA 2 Standard Carriage CLM16 IOM DOC 5 8 09 Wide Body Carriage...
Page 33: ...Lower Limit Switch CLM16 IOM DOC 5 8 09...
Page 43: ...Column Base Frame Height 2 CLM16 IOM DOC 5 8 09...
Page 45: ...Column Cover CLM16 IOM DOC 5 8 09...
Page 47: ...Dolly CLM16 IOM DOC 5 8 09...
Page 49: ...Drive Assembly CLM16 IOM DOC 5 8 09...
Page 51: ...Carriage Standard CLM16 IOM DOC 5 8 09...
Page 53: ...Universal CLM16 IOM DOC 5 8 09...