CET Electric Technology
63
The setpoints can be programmed via the Web Interface or communications and have the following setup
parameters:
Parameter
Definition
Options/*Default
Setpoint
Type
Disabled, Over or Under Setpoint.
0=Disabled*
1=Over Setpoint
2=Under Setpoint
Setpoint
Parameter
Specify the parameter to be monitored.
See
, 1*
Over Limit
Specify the value that the setpoint parameter must exceed for Over
Setpoint to become active or for Under Setpoint to become
inactive (Invalid if DIx is monitored).
Default=999,999
Under Limit
Specify the value that the setpoint parameter must go below for
Over Setpoint to become inactive or for Under Setpoint to become
active. (Invalid if DIx is monitored).
Default=999,999
Active Delay
Specify the minimum duration that the setpoint condition must be
met before the setpoint becomes active. An event will be
generated and stored in the SOE Log.
0 to 9999 (s) for
Standard Setpoint, 10*
0 to 999 (Cycles) for HS
Setpoint,10*
Inactive
Delay
Specify the minimum duration that the setpoint return condition
must be met before the setpoint becomes inactive. An event will
be generated and stored in the SOE Log.
Trigger 1/2
Specify what action a setpoint would take when it becomes active.
Please refer to
below for a list of Setpoint Triggers.
See
Table 4-10 Description for Setpoint Parameters
The iMeter 6 provides the following Setpoint parameters, Standard Setpoint can monitor all parameters while
the HS Setpoint only can monitor parameters 1 to 14.
Key
Parameter
Scale/Unit
1
Uln
x100, V
2
Ull
x100, V
3
I
x1000, A
4
I4
1
x1000, A
5
Freq Deviation
x100, Hz
6
kW Total
kW
7
kvar Total
kvar
8
PF
x1000
9
DI1
1)
For Over Setpoint, the Active Limit is DI Close (
DI=1
), and
Inactive Limit is DI Open (
DI=0
);
2)
For Under Setpoint, the Active Limit is DI Open (
DI=0
),
and Inactive Limit is DI Close (
DI=1
).
10
DI2
11
DI3
12
DI4
13
DI5
14
DI6
15
AI
/
16
kW Total Present Demand
kW
17
kvar Total Present Demand
kvar
18
PF Present Demand
x1000
19
Total kW Predicted Demand
kW
20
Total kvar Predicted Demand
kvar
21
PF Predicted Demand
x1000
22
U THD
x100, %
23
U TOHD
x100, %
24
U TEHD
x100, %
25
I THD
x100, %
26
I TOHD
x100, %
27
I TEHD
x100, %
28
U2 Unbalance
x10, %
29
I2 Unbalance
x10, %
30
U OverDeviation
x100, %
31
Voltage Phase Reversal
Over/Under Limit settings are invalid when Voltage Phase
Reversal is set as the Setpoint Parameter. Please See Note 2)
to check the Phase Reversal logic diagram.
32
Ir Calculated
x1000, A
33
U2 (Negative Sequence Voltage)
x100, V
34
U0 (Zero Sequence Voltage)
x100, V
35
Current Phase Reversal
Over/Under Limit settings are invalid when Current Phase
Reversal is set as the Setpoint Parameter. Please See Note 2)
to check the Phase Reversal logic diagram.
Table 4-11 Setpoint Parameters