![CET iMeter 6 User Manual Download Page 61](http://html1.mh-extra.com/html/cet/imeter-6/imeter-6_user-manual_2584638061.webp)
CET Electric Technology
54
Figure 3-105 Maintenance – DO Release Command Failed
Further, the
DO Forced On/Off
operations from the
Front Panel
have the highest priority as discussed in
Section
. If a DO is accidentally left in the
DO Forced On/Off
state without being returned to the
Normal
state, PQ or
other Control Setpoints will no longer be able to trigger it during an alarm situation. To solve this problem, the
Reset
All DOs to Normal
has been implemented to allow the resetting of the DO from the
Forced On/Off
state back to the
Normal
state via the Web Interface.
•
Clear
Perform the various
Clear
operations by groups or individually:
Figure 3-106 Maintenance – Clear Operations