ENGLISH
The part reference “B135LN-C ; B135LN-CA” includes the following:
– Basic tool complete with battery and shoulder strap
– Spare battery
– Battery charger
– Plastic carrying case “VAL P9-C”
2. INSTRUCTIONS FOR USE
2.1) Preparation
(Ref. to Figs. 1 and 2)
The tool can be easily carried using either the handle or the shoulder strap (T) attached
to the rings (R and R1).
With the tool in the rest position proceed as follows:
– Select the appropriate die set for the connector.
– Insert the die (91) in the upper seat of the tool head until it is locked by die/head pin (50).
To ease the die insertion, keep die/head release pin (49) depressed.
– Operate the tool (see § 2.2) to advance the ram (206) 8-10 mm (0.3 - 0.4 in.) and
insert the die (90) into the seat on the ram until it is locked by die/ram retaining pin (85).
To ease this operation, keep die/ram release pin (88) depressed.
– Insert the conductor in the connector.
– Position the connector between the dies and ensure the correct location of the crimp
points.
N
EVER
PRESSURISE
THE
TOOL
WITHOUT
INSERTING
THE
DIES
,
THIS
COULD
CAUSE
DAMAGE
TO
THE
HEAD
AND
THE
RAM
.
2.2) Die advancement
Press the operating button (06) to activate
the motor-pump and advance the lower
die.
This fi rst stage rapidly closes the dies to
the connector.
To halt the advancement, release th operat-
ing button (06) and the motor will cut out.
Make sure the dies are exactly positioned
on the desired crimp point otherwise re-
open dies following instructions as per
§ 2.5 and reposition the connector.
2.3) Compression
– By keeping operating button (06) pressed, the motor continues to operate: the tool
will automatically change over to the high pressure stage and the ram will gradually
move forward until the two dies touch.
31
4
205
201
200
206
02
03
04
08
12
30
33
34
35
42
40
38
43
44
45
45
51
52
54
55
56
61
63
65
74
75
77
78
79
89
91
49
48
66
50
90
36
37
46
62
82
83
207
85
88
87
87
43
45
44
86
06
201