15
1.2 Installation
1.2.1 Choosing the Installation Site
(1) Power supply
• Select an installation site that is near a power source to ensure that the
attached AC adapter is used properly. If this is not possible, an optional battery
pack is available as a special accessory.
• Verify that the supply power voltage conforms to that indicated on the AC
adapter.
(1)
Installation site
Choose an installation site where the balance will be protected from the
following:
• corrosive or flammable gasses.
• dust, wind, vibration, electromagnetic waves, or magnetic fields.
• direct sunlight.
• extreme temperature or humidity.
• rain or the possibility of being splashed with water.
Large capacity balances should be installed on a sturdy floor and table that can
withstand the total load of the balance AND object to be weighed.
1.2.2 Balance Installation
1) Put the balance onto its side and unscrew the 2
transportation screws in accordance with the
instruction label on the bottom of the balance.
Screw these into the “Release” hole.
2) Place the balance unit as shown in the diagram on
the right. If intending to fit the vinyl cover, fix it at
this stage of the procedure. Refer to “Fitting the
Vinyl Cover”, mentioned later.
Release hole
Instruction label
Summary of Contents for CBW
Page 1: ...2 CBX 앞표지 ...
Page 2: ...3 PRECAUTIONS ...
Page 3: ...4 ...
Page 27: ...28 ...
Page 79: ...80 MEMO ...
Page 80: ...81 MEMO ...
Page 81: ...82 MEMO ...
Page 82: ...83 ...
Page 83: ...84 ...