
6K7304 | 2014-10-20
2–1
2
Site Preparation
Site Preparation
Before installing the CR system, make sure your site meets the following requirements:
Work Area
•
Prepare a table with a flat stable surface and without wheels.
•
Make sure you have enough free space around the work area.
Power Requirements
Make sure you have at least three wall power outlets to connect the following
equipment:
•
CR system
•
Monitor
•
Computer
Using extension cords or power strips is not recommended.
Summary of Contents for Carestream Vita Flex CR System
Page 1: ...l Publication No 6K7304 2014 10 20 Version 2 0 CARESTREAM Vita Flex CR System User Guide...
Page 6: ...iv 6K7304 2014 10 20...
Page 8: ...About this Guide 1 2 6K7304 2014 10 20...
Page 14: ...Site Preparation 2 6 6K7304 2014 10 20...
Page 32: ...Install the CR System 4 16 6K7304 2014 10 20...
Page 40: ...Use the CR System 5 8 6K7304 2014 10 20...
Page 46: ...Use the CR System 5 14 6K7304 2014 10 20...
Page 56: ...Maintain and Clean the System Cassette Screen Roller Cleaning 6 10 6K7304 2014 10 20...
Page 82: ...System Self Test 9 6 6K7304 2014 10 20...