ET107 Weather Station
3
8.
Securely tape box shut if transporting entire station to another site.
9.
If at the main site, remove communication components that are installed at
the calling computer. Repackage remaining components for transport to
field site.
FIGURE 3-3. ET107 with the Met One 034B-ETM Wind Sensor, top
layer
FIGURE 3-4. ET107, bottom layer
Wind Set
Enclosure
Crossarm with Rain, Solar, and
Temp/RH Sensors
Instruction
Manual
Cardboard
Containing
Wind Vane
Mounting Template Grounding Wire
and Enclosure Desiccant Packs
2-Piece Pole
Grounding and
Lightning Rod
AC Transformer
and Cabling
Mounting Bolts
and Hardware
Enclosure
Battery
PVC Swept
Elbow Conduit
Communication
Option Cabling
Temp/RH
Radiation
Shield