SECTION 10. PROCESSING INSTRUCTIONS
10-12
TABLE 10-2. Maximum Number of Outputs and Output Order for K Input Values.
(The output order flows from left to right and from top to bottom)
INPUTS:
X1
X2
X3
X4
.....
XK
MAX NO.
OUTPUTS
TYPE
OUTPUTS
(1st)
(2nd)
(3rd)
(4th)
(Kth)
Means
K
M(X1)
M(X2)
M(X3)
M(X4)
.....
M(XK)
Variances
K
V(X1)
V(X2)
V(X3)
V(X4)
.....
V(XK)
Std. Deviation
K
SD(X1)
SD(X2)
SD(X3)
SD(X4)
.....
SD(XK)
Covariance
(K/2)(K-1)
CV(X1,X2)
CV(X1,X3)
CV(X1,X4)
.....
CV(X1,XK)
CV(X2,X3)
CV(X2,X4)
.....
CV(X2,XK)
CV(X3,X4)
.....
CV(X3,XK)
...
.
..
.
.
.
CV(XK-1,XK)
Correlation
(K/2)(K-1)
CR(X1,X2)
CR(X1,X3)
CR(X1,X4)
.....
CR(X1,XK)
Coefficient
CR(X2,X3)
CR(X2,X4)
.....
CR(X2,XK)
CR(X3,X4)
.....
CR(X3,XK)
...
.
..
.
.
.
CR(XK-1,XK)
SYMBOL
DEFINITION
M(XK)
Mean of Kth value
V(XK)
Variance of Kth value
SD(XK)
Standard deviation of Kth value
CV(XK,X1)
Covariance of Kth and Ith value
CR(XK,X1)
Correlation of Kth and Ith value
MAXIMUM NUMBER OF POSSIBLE
OUTPUTS
No limitation exists on the number of inputs that
can be processed by the COV/CORR
Instruction, but the processing time and
Intermediate Storage requirements increase
rapidly. The instruction requires that the input
values reside sequentially in Input Storage.
Since the number of outputs is specified for each
type of statistical calculation, the instruction
starts with the first value, working sequentially
through the input values. For this reason, the
order of the input values determines which
values are processed.
Table 10-2 shows the maximum number of
outputs which can be generated and the output
order for K input values located sequentially in
Input Storage. The output order shown in Table
10-2 flows from left to right and top to bottom.
INSTRUCTION PROCESSING
The CV/CR Instruction contains 3 separate
processing phases:
1.
Input Processing
2.
Averaging Period Processing
3.
Output Processing
The Input Processing phase is where new input
values are received, the necessary squares or
cross products formed, and the appropriate
summations calculated as required by the
desired final output. The rate at which the
measurements can be made, the input values
ordered, and the input processing phase
completed without interruption determines the
maximum rate of execution (see Execution
Time).
Summary of Contents for CR23X
Page 8: ...CR23X TABLE OF CONTENTS vi This is a blank page ...
Page 12: ...CR23X MICROLOGGER OVERVIEW OV 2 1 2 3 A 4 5 6 B 7 8 9 C 0 D FIGURE OV1 1 CR23X Micrologger ...
Page 34: ...CR23X MICROLOGGER OVERVIEW OV 24 This is a blank page ...
Page 50: ...SECTION 1 FUNCTIONAL MODES 1 16 This is a blank page ...
Page 72: ...SECTION 4 EXTERNAL STORAGE PERIPHERALS 4 8 This is a blank page ...
Page 88: ...SECTION 6 9 PIN SERIAL INPUT OUTPUT 6 10 This is a blank page ...
Page 110: ...SECTION 7 MEASUREMENT PROGRAMMING EXAMPLES 7 22 This is a blank page ...
Page 134: ...SECTION 8 PROCESSING AND PROGRAM CONTROL EXAMPLES 8 24 This is a blank page ...
Page 164: ...SECTION 9 INPUT OUTPUT INSTRUCTIONS 9 30 This is a blankpage ...
Page 188: ...SECTION 11 OUTPUT PROCESSING INSTRUCTIONS 11 8 This is a blankp age ...
Page 221: ...SECTION 13 CR23X MEASUREMENTS 13 21 FIGURE 13 5 1 Circuits Used with Instructions 4 9 ...
Page 229: ...14 3 1 2 3 A 4 5 6 B 7 8 9 C 0 D FIGURE 14 3 1 CR23X Battery Pack and Panel ...
Page 240: ...SECTION 14 INSTALLATION AND MAINTENANCE 14 14 This is a blank page ...
Page 244: ...APPENDIX A GLOSSARY A 4 This is a blank page ...
Page 268: ...APPENDIX B CONTROL PORT SERIAL I O INSTRUCTION 15 B 24 This is a blank page ...
Page 276: ...APPENDIX C BINARY TELECOMMUNICATIONS C 8 This is a blank page ...
Page 278: ...This is a blank page ...
Page 282: ...APPENDIX F DYNAGAGE SAP FLOW P67 F 4 This is a blank page ...
Page 299: ...APPENDIX I TD OPERATING SYSTEM ADDENDUM FOR CR510 CR10X AND CR23X MANUALS ...
Page 300: ...This is a blank page ...
Page 302: ...This is a blank page ...
Page 308: ...TABLE DATA ADDENDUM AD 6 This is a blank page ...
Page 324: ...TD ADDENDUM SECTION 1 FUNCTIONAL MODES AD 1 8 This is a blank page ...
Page 340: ...TD ADDENDUM SECTION 8 PROCESSING AND PROGRAM CONTROL EXAMPLES AD 8 10 This is a blank page ...
Page 342: ...This is a blank page ...
Page 373: ...This is a blank page ...