
49
EN
10.3 Inspection
(Carried out by the operator in accordance with EN 806-5)
Inspection activities
Interval
Note for
products
WITHOUT
active
BWT DES
registration
Note for
products
WITH
active
BWT DES
registration
Check/refill regenerative
According to use
Required
Required
Check/refill metered substance
According to use
Required
Required
Check brine containers for soiling
Every 2 months
Required
Required
Check for leaks, visual inspection
Every 2 months
Required
Required
Functional test/control unit display
Every 2 months
Required
Not required
Test regenerative consumption depending
on the treated water
Every 2 months
Required
Not required
Check the setting of the regeneration waste
water system
Every 2 months
Required
Required
Check the counting function of the water
meter
Every 2 months
Required
Not required
Test the regeneration process
Every 2 months
Required
Not required
Clean the brine container and the internal
surfaces that come into contact with water
Every 6 months
Required
Required
Summary of Contents for Perla hybrid
Page 58: ...58...