![BWT Perla hybrid Installation And Operating Manual Download Page 37](http://html1.mh-extra.com/html/bwt/perla-hybrid/perla-hybrid_installation-and-operating-manual_2836733037.webp)
37
EN
8.7
Stoppages and reactivating the
unit
In case of expected stagnation phases, take the
following preventive measures:
BWT recommendations for restarting a unit after
stagnation phases:
Fewer than 3 days:
None
Start-up rinse of the product. Then open all taps to
rinse the system.
3 to 30 days:
Close the Multiblock.
Open the main shut-off valve and the Multiblock.
Regenerate both exchanger columns. Then open
all taps to rinse the system.
1 to 6 months:
Close the Multiblock and shut down the product.
Open the main shut-off valve and the Multiblock.
Have BWT after-sales service perform a regen-
eration of both exchanger columns using Dioxal
disinfectant.
Then open all taps to rinse the system.
Longer than 6 months:
Close the Multiblock and shut down the product.
Reconnect the unit to the municipal drinking water
system.
Have BWT after-sales service perform a regen-
eration of both exchanger columns using Dioxal
disinfectant.
Summary of Contents for Perla hybrid
Page 58: ...58...