
22
EN
Installation check 3/4
Check the connection and position of the AQA Stop
floor sensor.
Press
CONFIRM
Following screen:
Re-filling the regenerative
Installation check 4/4
Check the level of the regenerative.
Caution:
Do not pour water into the device!
Press
CONFIRM
Following screen:
Installation check
NOTE
►
When filling the regenerative, make sure
that no dirt gets into the locking mecha-
nism (red circle).
Installation check
The installation check is completed successfully
when all four icons are green.
Press
CONTINUE
Device registration begins.
The start-up rinse runs in the background (lasts
approx. 6 minutes).
Following screen:
Registration
Summary of Contents for Perla hybrid
Page 58: ...58...