8. 

FILLING THE HEATING INSTALLATION

Table 7

Problem

Prevention

Possible  installation  damage  due 

to strains in the material caused by 

temperature differences

Fill the heating installation only in cold conditions 

(inlet temperature must not exceed 40 °C).

Danger of installation damage due to 

accumulation of deposits

Condensate  formation  and  tar 

deposits  may  shorten  boiler’s 

operational life.

-

 

Do not operate the heating boiler for a long 

period of time in partial load mode

-

 

The temperature at the boiler inlet must not 

be  less  than  65°C,  boiler  water  temperature 

must be between 80 °C and 85 °C.

-

 

Use the boiler for a short period to heat warm 

water in the summer.

9. OPERATION OF BOILER

Failure to observe the installation 

and  operating  requirements 

described in the manual and 

the  service  booklet  voids  the 

warranty.

9.1.  Operation  of  Dual  chamber 

CombiBurn DC-A 

• 

IGNITION. 

After  the  start  up  of  the 

boiler  from  the  control  panel,  the  main 

pellet  auger  conveys  certain  amount  of 

fuel from the pellet hopper to the burner. 

This  specific  amount  of  pellets  is  set  by 

the  installer  and  depends  on  the  fuel 

characteristics.  The  fed-in  quantity  of 

pellets is being ignited using hot air.

• 

BURNING. 

The  burning  process  takes 

place  in  the  combustion  chamber  and, 

after it has been fed into the combustion 

chamber,  the  fuel  is  then  transported 

from  the  internal  auger  conveyor  to  the 

combustion  chamber  in  portions.  This 

allows  for  constant  and  optimal  burning 

rate  of  the  fuel.  Fuel  combustion  is 

monitored  by  a  temperature  sensor  in 

the  exhaust  gases,  which  reports  the 

combustion  and  submits  information  to 

the  control  unit  for  a  possible  start  or 

interruption  of  the  combustion  process. 

The output of the burner is determined by 

the intervals preset on the control panel 

taking into account the heating value, size 

and density of the pellets.

• 

AUTOMATIC CLEANING SYSTEM

The 

Dual  chamber  boiler  DC-A  is  equipped 

with  innovative  automatic  cleaning 

system for combustion chambers of both 

divices. 

A  powerful  cleaning  motor  built  in  the 

burner body, air is being blown in at high 

speed and rate thus removing all residues 

–  ash,  noncombustible  inclusions,  etc. 

built up into the combustion chamber of 

the burner.

At  the  same  time  the  boiler  turns 

on  automatic  ash  removal  which  is 

transported to the ash container through 

screw  located  in  the  lower  part.  These 

automatic  cleaning  cycles  last  several 

seconds and can be additionally adjusted 

as well as their repeat rate depending on 

the load of the burner.

 

Summary of Contents for CombiBurn DC-A v2 series

Page 1: ...TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL DUAL CHAMBER BOILER CombiBurn DC A v2 series EN Version p0 1 2 Model Serial No...

Page 2: ...7 2 5 Boiler safety devices 8 3 FUELS 8 4 TRANSPORTATION OF THE BOILER 11 5 DELIVERY PACKAGE 11 6 INSTALLATION OF THE HEATING BOILER 12 7 SETUP OF THE HEATING BOILER 12 7 1 Connecting the boiler to a...

Page 3: ...Instructions to boiler installer During installation and operation the country specific requirements and regulations must be observed Local construction regulations on installation air supply and exha...

Page 4: ...e flammable liquids for ignition or increase of burner output Collect ash in lid covered fireproof containers Clean the burner surface using non flammable agents only Do not place flammable objects on...

Page 5: ...od beech oak Wood softwood layered wood Class C3 easy flammable Asphalt cardboard cellulose tar fiberboard cork polyurethane polyethylene Diagram 1 Recommended clearances between boiler and walls For...

Page 6: ...urner 3 Self cleaning function adjustable 1 4 times over 24 hours at equal intervals programmable start time 4 Built in discharge mechanism drives the ash and soot into a removable container 5 Control...

Page 7: ...hanism 9 Support with adjustable leg 2 4 Design of auger mechanism and fuel hopper pellets It consists of a spiral conveyor mounted to the axle driven by motor reducer which is attached to the body of...

Page 8: ...circuit current overload etc the overload is borne by the electrical fuse fitted on the main control panel of the burner 10 Power interruption In case of power interruption all parameter settings are...

Page 9: ...asing pellets ask for conformity declaration and certificateissuedbyanaccredited laboratory and make sure the fuel meets the requirements indicated in the manual If you purchase large amount of pellet...

Page 10: ...g 2 1 0 1 0 1 0 Cadmium content mg kg 2 0 5 0 5 0 5 Mercury content mg kg 2 0 1 0 1 0 1 Lead content mg kg 2 10 10 10 Nickel content mg kg 2 10 10 10 Zinc content mg kg 2 100 100 100 1 not more than 1...

Page 11: ...uthorized service center for repairs and maintenance The boiler is securely fastened with fasteners to a wooden pallet Important When installing the boiler the wooden pallet onto which the boiler is p...

Page 12: ...ase of the heating boiler according to diagram 1 The boiler must be placed in a position which allows for the easiest possible cleaning and servicing Installation must be carried out according to inst...

Page 13: ...pacity of the boiler see diagram 6 Data in the tables are for indicative purposes Draught depends on the diameter height unevensections along the chimney surface and differences in temperature of comb...

Page 14: ...ter from the water mains which passes through the heat exchanger and absorbs the heat in the boiler The water is then discharged into the sewage system This arrangement ensures safe evacuation of the...

Page 15: ...ATION and OPERATION MANUAL 1 Water supply network pressure 6 10 bar 2 Drainage sewerage 3 Boiler DC A v2 4 Safety heat exchanger inlet 5 BVTS valve sensor 6 Safety heat exchanger outlet Diagram 7 Conn...

Page 16: ...1 pc 2 0 5 yellow green cable shoe 5 1 pc 2 0 5 yellow green cable shoe 5 1 pc H05VV F 3G0 75 H05VV F 3G0 75 H05VV F 3G0 75 H05VV F 2G0 75 H05VV F 2G0 75 H05VV F 2G0 75 H05VV F 2G0 75 NTC sensor L 0...

Page 17: ...20V 001 002 004 005 006 007 008 009 010 011 012 013 014 015 018 019 I01 I02 I03 I04 I05 I06 I07 I08 I09 I10 I11 I12 I13 I14 I15 I16 I18 016 017 PE 003 021 020 N L _ _ heater signal _ Y U N L _ Y U N L...

Page 18: ...for connection of the components of th 4 5 6 7 10 11 8 L 8 9 1 2 10 11 7 6 3 4 5 12 13 12 13 heater signal 2 0 75m 0 4m 2 pc cable shoe 6 3mm insulated STB yellow gr 3 1 5mm Inputs Designation Group 1...

Page 19: ...or sleeve red black blue brown Rotary actuators FAN CY 100 blue blue brown brown H05VV F 2G 0 75 FM 2pc cable shoe 6 3mm insulated ACTUATOR GRUNER 304 230 05 5N H05VV F 2G 0 75 blue brown blue brown E...

Page 20: ...item 11 4 at the drainage outlet 2 Due to freezing 2 If the heating installation including the piping network has not been built frost proof we recommend that you fill the heating installation with a...

Page 21: ...ture Adjust using gas analyzer Smoke in the pellet hopper Poor chimney draught or high internal resistance of the boiler combustion chamber Immediately consult your installer about the problem Blockag...

Page 22: ...L PASSPORT INSTALLATION and OPERATION MANUAL TE 7 5 Connection diagrams Such connections must be performed by a technician service shop authorized for such operations RT room thermostat Diagram 10 Con...

Page 23: ...23 AL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL T top T bottom Diagram 11 Connection of Dual chamber boiler CombiBurn DC A v2 to P type buffer tank and three way valve...

Page 24: ...NSTALLATION and OPERATION MANUAL TE TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE Diagram 12 Connection of Dual chamber boiler CombiBurn DC A v2 to combi tank KSC2 flat plate solar collector...

Page 25: ...ICAL PASSPORT INSTALLATION and OPERATION MANUAL T top T bottom Diagram 13 Connection of Dual chamber boiler CombiBurn DC A v2 to to solar tank SON buffer thank P flat plate solar collector PK and thre...

Page 26: ...he fuel characteristics The fed in quantity of pellets is being ignited using hot air BURNING The burning process takes place in the combustion chamber and after it has been fed into the combustion ch...

Page 27: ...lure to observe the installation and operating requirements described in the manual and the service booklet voids the warranty 10 CONTROLLER UNIT 10 1 Controller view Explanation of buttons and indica...

Page 28: ...tem checkup Boiler increased temperature Those two symbols appearance on the screen where the boiler temperature is displayed means that boiler temperature has increased up to 99 C In such a case plea...

Page 29: ...mperature of the domestic hot water has reached the maximum preset temperature In Parallel Pumps mode the room thermostat controls the heating installation pump regardless of the temperature of domest...

Page 30: ...using the Enter button you can change the parameters You can adjust the maximum domestic hot water temperature inside the storage tank as well as the switch on hysteresis for the circulation pump aft...

Page 31: ...Auto If we want this to happen mark the check box through the navigation buttons Once you choose this feature and the exhaust temperature of the boiler drops below the set pint temperature in menu Set...

Page 32: ...olume Liters 113 Wood combustion chamber volume Liters 96 Pellets combustion chamber volume Liters 72 Required chimney draught Pa mbar 20 0 20 Recommended fuel Automatic loading Wood pellets EN 14961...

Page 33: ...urner kg 610 12 2 Elements of Dual Chamber boiler CombiBurn DC A v2 1 Dual chamber boiler 2 Fuel Hopper 3 Auger 4 Pellet chips burner 5 Control unit 6 Safety heat evacuator 7 Thermal wool insulation 8...

Page 34: ...llected separately from other recyclable waste containing materials with adverse effect on health and environment According to Directive 2002 96 EC regarding electrical and electronic equipment waste...

Page 35: ...AL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 36: ...unsystem bg 12 Madara Blvd 9700 Shumen Bulgaria t 359 54 874 555 f 359 54 874 556 e mail ftrade sunsystem bg 13 Chelopeshko Shose Str 1839 Sofia Bulgaria t 359 2 903 97 80 f 359 54 874 556 e mail sale...

Reviews: