11
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
4. TRANSPORTATION OF THE BOILER
We recommend to transport the heating
boiler to the installation site in its
packaging placed on the pallet. During
transport and installation, depending on
the weight, suitable safety devices should
be used in accordance with Directive
2006/42/EC.
When transporting items weighing more
than 30 kg, the use of pallet jack, fork
truck or other hoisting devices is a must.
Product must be in original packaging
following the instructions on the label -
to be protected from adverse weather
conditions (snow, rain and dust) from
the shocks, and other activities likely to
cause damage. In case of malfunction of
the fan or the motor drive (noise, friction)
or failure of high-tech elements such as
broken LCD screen, contact your nearest
authorized service center for repairs and
maintenance.
The boiler is securely fastened with
fasteners to a wooden pallet.
Important: When installing the
boiler, the wooden pallet onto
which the boiler is placed must
be removed by unscrewing the
bolted connections using flat ring
wrench S13.
Table 4.
Overal dimensions of Set CombiBurn DC-A
v2, including: Dual-chamber boiler, Burner,
Auger, Fuel hopper, ash-and soot container
(packed and placed into Fuel Hopper).
Set
CombiBurn
A,
mm
B,
mm
C,
mm
D,
mm
Weight,
kg
DC 35 A v2
1200 1600 125 1925 645
Diagram 5.
Indications dimensions
5. DELIVERY OF THE BOILER
• Inspect the integrity of the packaging
upon delivery.
• Check whether all components
have been delivered to you. Boiler
consignment package includes:
1) Set CombiBurn DC-A v2: boiler, burner,
ash-and-soot container.
2) Safety valve 3 bar.
3) Fire irons.
4) Cleaning brush for flue pipes.
5) Technical passport
.
Installation and
operation manual .
6) Service booklet and Warranty card.
If any of the above items are missing,
contact your supplier.