
2-47
Setup Procedure
Renaming a Central Subsystem
Note:
Central Subsystem configuration is reserved for Customer Service Engineers.
The Central Subsystem may be renamed to suit Customer requirements. Changes to Central
Subsystem configuration entail removing the existing Central Subsystem from the
configuration and adding a new Central Subsystem to the configuration with the name
chosen by the Customer.
Removing / Adding a Central Subsystem
1. From the Support Administrator PAM Tree, click
Domain Manager
to check that all
domains are INACTIVE. If a domain is ACTIVE, request the Customer to power down the
domain. See
Powering Up / Down Server Domains
, on page 2-16.
2. Click
Configuration Tasks
→
Central Subsystem
. The Central Subsystem control pane
opens.
3. Select the Central Subsystem and click
Remove
. A dialog opens requesting you to confirm
removal.
4. Click
OK
to remove the Central Subsystem.
5. Click
New
. The
Add Central Subsystem
dialog appears.
Figure 49. Central Subsystem control pane
6. Enter the Central Subsystem name supplied by the Customer and the hardware
hexadecimal identifier (between 0 and F as indicated on the PMB CSS code wheel).
Note:
Up to 16 CSS modules can be linked, via a PMB to the PAP unit. PMB code wheels allow
the identification of each cabinet and each CSS module in the Customer's configuration.
Note:
The Central Subsystem name is forced to uppercase characters by the system for
compatibility reasons.
Summary of Contents for NovaScale 5xx5
Page 1: ...NovaScale 5xx5 Installation Guide NOVASCALE REFERENCE 86 A1 40EM 06...
Page 2: ...BLANK...
Page 8: ...vi Installation Guide Index X 1...
Page 12: ...x Installation Guide...
Page 22: ...xx Installation Guide...
Page 26: ...xxiv Installation Guide...
Page 105: ...2 55 Setup Procedure...
Page 116: ...A 10 Installation Guide...
Page 134: ...X 4 Installation Guide...
Page 137: ...BLANK...
Page 138: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE 86 A1 40EM 06 REFERENCE...
Page 140: ......