Installation Guide
Connecting the Server to the Power Supply
Step
OK
•
Mount power supply cable sockets
•
Connect the server power cables to the dedicated power supply
Powering up the Server
Step
OK
•
Power on the server to the standby mode
•
Launch PAM software
•
Check server status
•
Test CSS module ring connexions
•
Power up / down the server domain(s)
•
Shut down / restart the server
Completing PAP Unit Configuration and Operating System Setup
Step
OK
•
Change the PAP unit default name
•
Launch the PAP Configuration Setup wizard
•
Configure Customer information
•
Configure Autocalls
•
Connect the PAP unit to the Enterprise LAN
•
Complete Operating System setup for the server domain(s)
•
Initializing the PAP Unit Backup Disk
Summary of Contents for NovaScale 5xx5
Page 1: ...NovaScale 5xx5 Installation Guide NOVASCALE REFERENCE 86 A1 40EM 06...
Page 2: ...BLANK...
Page 8: ...vi Installation Guide Index X 1...
Page 12: ...x Installation Guide...
Page 22: ...xx Installation Guide...
Page 26: ...xxiv Installation Guide...
Page 105: ...2 55 Setup Procedure...
Page 116: ...A 10 Installation Guide...
Page 134: ...X 4 Installation Guide...
Page 137: ...BLANK...
Page 138: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE 86 A1 40EM 06 REFERENCE...
Page 140: ......