2-16
Installation Guide
Powering Up / Down Server Domains
When server status has been checked - system functional status icon and CSS availability
status bar green in the Status pane - the server can be powered up.
To power up / down the server, see:
•
Powering Up / Down the NovaScale 5xx5 Partitioned Server Domains, on page 2-18
Powering Up the NovaScale 5xx5 SMP Server Domain
NovaScale 5xx5 SMP Servers are designed to operate as single SMP systems and are
delivered with one pre-configured domain.
When server status has been checked - functional status icon and CSS availability status bar
green in the Status pane - the server domain can be powered up.
Note:
If an error dialog box appears during these sequences, see
Managing Domains
in the User's
Guide.
To power up / down server domains:
1. From the Customer Administrator / Operator PAM Tree, click
Domain Manager
to open
the
Control
pane. A dialog box invites you to load the server domain.
2. Click
OK
to confirm. The domain appears in the Control pane. If the domain is ready to
be powered up,
INACTIVE
is displayed in the
Domain State
box and the
Power On
button
is accessible.
3. Select the domain and click
Power On
to power up the server domain and associated
hardware components.
1
Functional status icon
2
CSS availability status indicator (GREEN)
3
Operating system type
Figure 33. Domain Manager Control pane
Summary of Contents for NovaScale 5xx5
Page 1: ...NovaScale 5xx5 Installation Guide NOVASCALE REFERENCE 86 A1 40EM 06...
Page 2: ...BLANK...
Page 8: ...vi Installation Guide Index X 1...
Page 12: ...x Installation Guide...
Page 22: ...xx Installation Guide...
Page 26: ...xxiv Installation Guide...
Page 105: ...2 55 Setup Procedure...
Page 116: ...A 10 Installation Guide...
Page 134: ...X 4 Installation Guide...
Page 137: ...BLANK...
Page 138: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE 86 A1 40EM 06 REFERENCE...
Page 140: ......