1-11
Delivery
Inspecting Internal Components and Cabling
A thorough visual inspection of internal components and cabling should now be carried out
before powering up the server.
CAUTION:
If the inspection indicates an unacceptable safety condition, the condition must be corrected
before powering up the server.
1. Visually check internal cables for damage.
2. Visually check system components for damage.
3. Manually check internal cable connections.
4. Visually check external power cables for damage.
Note:
If you need to check CSS Module components, refer to the
Maintenance and Service Guide
.
For guidance with cabling, see
Cabling Guide
, 86 A192ER.
Summary of Contents for NovaScale 5xx5
Page 1: ...NovaScale 5xx5 Installation Guide NOVASCALE REFERENCE 86 A1 40EM 06...
Page 2: ...BLANK...
Page 8: ...vi Installation Guide Index X 1...
Page 12: ...x Installation Guide...
Page 22: ...xx Installation Guide...
Page 26: ...xxiv Installation Guide...
Page 105: ...2 55 Setup Procedure...
Page 116: ...A 10 Installation Guide...
Page 134: ...X 4 Installation Guide...
Page 137: ...BLANK...
Page 138: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE 86 A1 40EM 06 REFERENCE...
Page 140: ......