
2-21
Setup Procedure
12.Repeat Steps 10 and 11 for each domain.
13.Check the Operating System environment pre-installed on each domain.
14.Shut down each Operating System to power down the corresponding domain to the
stand-by mode.
15.Toggle the local / integrated console to the PAP unit display.
INACTIVE
is displayed in the
Domain State
boxes and the
Power ON
button is accessible for each domain.
Note:
For further details about the
Power ON
/ OFF
sequences, see
Powering ON a Domain
and
Powering OFF a Domain
in the
User's Guide
.
Shutting Down / Restarting the Server
1. From the PAM home page, click
File
→
Close
to return to the Microsoft Windows desktop.
2. Shut down the PAP unit by selecting the
Shut Down
command in the Start Menu.
3. Request the Customer to turn the power supply circuit breakers OFF.
4. Request the Customer to turn the power supply circuit breakers ON.
The Platform Management Board (PMB) in each CSS module automatically powers up to
the standby mode (48V) and the Platform Administration Processor (PAP) unit
automatically boots Microsoft Windows
software.
Summary of Contents for NovaScale 5xx5
Page 1: ...NovaScale 5xx5 Installation Guide NOVASCALE REFERENCE 86 A1 40EM 06...
Page 2: ...BLANK...
Page 8: ...vi Installation Guide Index X 1...
Page 12: ...x Installation Guide...
Page 22: ...xx Installation Guide...
Page 26: ...xxiv Installation Guide...
Page 105: ...2 55 Setup Procedure...
Page 116: ...A 10 Installation Guide...
Page 134: ...X 4 Installation Guide...
Page 137: ...BLANK...
Page 138: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE 86 A1 40EM 06 REFERENCE...
Page 140: ......