2-20
Installation Guide
1
Functional status icon
2
CSS availability status indicator (GREEN)
3
Operating system type
Figure 36. Domain Manager Control pane - example with 4 domains
5. Click
Multiple Power
. The
Multiple Power Domains On/Off
dialog opens.
6. Click
Power On All
→
Execute
to simultaneously power on the domains and associated
hardware components.
Figure 37. Multiple power dialog - example with 4 domains
Note:
Domains can also be powered on sequentially from the
Control
pane:
•
Select
a domain in the
Control
pane and click
Power On
to power up the domain and
associated hardware components. Repeat this step for each domain in the
Control
pane.
7. Follow the power-on steps displayed in the
Domain State
boxes, until
RUNNING
is
displayed in all
Domain State
boxes.
Figure 38. Domain state - example with 4 domains
8. Toggle the local / integrated console from the PAP unit display to the first domain display.
See
Toggling the Local / Integrated Console Display
, on page 2-12.
9. Wait for the Operating System to load completely. The domain is now fully functional.
10.Toggle the local / integrated console from this domain display to the next domain
display.
11.Wait for the Operating System to load completely. The domain is now fully functional.
Summary of Contents for NovaScale 5xx5
Page 1: ...NovaScale 5xx5 Installation Guide NOVASCALE REFERENCE 86 A1 40EM 06...
Page 2: ...BLANK...
Page 8: ...vi Installation Guide Index X 1...
Page 12: ...x Installation Guide...
Page 22: ...xx Installation Guide...
Page 26: ...xxiv Installation Guide...
Page 105: ...2 55 Setup Procedure...
Page 116: ...A 10 Installation Guide...
Page 134: ...X 4 Installation Guide...
Page 137: ...BLANK...
Page 138: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE 86 A1 40EM 06 REFERENCE...
Page 140: ......