Section 2: Overview
2-27
Work Area 2 - Ball Accelerator and Standing Platforms
Infrequently, a pinsetter stop or maintenance requires access further into the machine. For situations
that cannot be performed from Work Area 1, Work Area 2 can be used. Refer to
Figures 2-27
and
2-28
.
This area may be used for such activities as:
1. Correcting Pinspotting Issues
2. Correcting Ball Return Stop - Pit Area
CAUTION: When accessing work area 2, the main power switch on the
StringPin Controller must be locked in the off position using a suitable locking
mechanism
(2)
WORK AREA 2
(1)
ACCESS STEPS
(1)
ACCESS STEPS
(2)
WORK AREA 2
Figure 2-27. Machine Work Area 2 - Ball Accelerator and Standing Platforms
(1) ACCESS STEPS
(2) WORK AREA 2
(1)
HANDRAILS
(2)
WORK AREA 2
(2)
WORK AREA 2
Figure 2-28. Machine Work Area 2 - Ball Accelerator and Standing Platforms
(1) HANDRAILS
(2) WORK AREA 2
Summary of Contents for StringPin
Page 1: ...Service Manual February 2019 55 900001 000 StringPin Pinsetter Ten Pin...
Page 6: ...6 StringPin Pinsetter Service Manual Intentionally Blank Page...
Page 35: ...Section 2 Overview 2 25 1 REAR ACCESS Figure 2 25 Machine Rear Access 1 REAR ACCESS...
Page 40: ...2 30 Section 2 Overview Intentionally Blank Page...
Page 102: ...4 16 Section 4 Adjustments Intentionally Blank Page...
Page 112: ...5 10 Section 5 Maintenance Service Intentionally Blank Page...
Page 126: ...7 8 Section 7 Cables Intentionally Blank Page...