5-2
Section 5: Maintenance & Service
Installing New String
When installing new string it is important to make sure the strings are routed through the machine
properly. Pay particular attention to how the strings are routed around the String Limiting Bar. The
strings for pins 4-6, and 7-10 go over the limiting bar. The strings for pins 1-3 route under the limiting
bar. Refer to
Figure 5-2.
Warning! Pinsetter power is to remain off while performing any manual
function.
WARNING! To avoid burning your hands wear gloves and use a rag to taper the
melted string end.
7
4/5/6 7/8/9/10
7
4
4
2
2
8
8
5
5
1
11
9
9
3
3
6
6
10
10
1
(1)
STRING LIMITING
BAR
2/3
(2)
STRING
SPOOLS
(3)
STRING
WAGON
(3)
STRING
WAGON
(1)
STRING LIMITING
BAR
(1)
STRING LIMITING
BAR
Figure 5-2. String Paths
(1) STRING LIMITING BAR
(2) STRING SPOOLS
(2) STRING WAGON
1. Cycle the pinsetter to first ball with ten pins on the pin deck.
2. Cut the string off any pin being replaced, just above its head. Refer to
Figure 5-3.
Summary of Contents for StringPin
Page 1: ...Service Manual February 2019 55 900001 000 StringPin Pinsetter Ten Pin...
Page 6: ...6 StringPin Pinsetter Service Manual Intentionally Blank Page...
Page 35: ...Section 2 Overview 2 25 1 REAR ACCESS Figure 2 25 Machine Rear Access 1 REAR ACCESS...
Page 40: ...2 30 Section 2 Overview Intentionally Blank Page...
Page 102: ...4 16 Section 4 Adjustments Intentionally Blank Page...
Page 112: ...5 10 Section 5 Maintenance Service Intentionally Blank Page...
Page 126: ...7 8 Section 7 Cables Intentionally Blank Page...