Section 2: Overview
2-11
The starting point for a string is the String Spool and Tension Lever Assembly. From the spool the
string routes through the String Wagon. The wagon moves back and forth in the main frame to lower
or raise the pins. From the wagon, the string continues through the Pin Motion Interface (PMI). The
PMI contains a switch that detects when a pin has been knocked over and a string brake that controls
whether the pin will be lowered to the pindeck when the string wagon moves toward the front of
the machine. Finally the string routes through a centering cone before it is tied to the pin. Refer to
Figure 2-11
.
(3)
PIN MOTION
INTERFACE
(PMI)
(4)
PIN
CONE
TOP
(1)
STRING WAGON
1
5
10
5
(2)
STRING SPOOL
AND TENSION LEVER
ASSEMBLY
(5)
PIN
CONE
BOTTOM
(6)
PIN
CONE
CAP
Figure 2-11. Main Frame - String Path
(1) STRING WAGON
(2) STRING SPOOL AND
(3) PIN MOTION INTERFACE (PMI)
(4) PIN CONE TOP
TENSION LEVER ASSEMBLY
(5) PIN CONE BOTTOM
(6) PIN CONE CAP
Summary of Contents for StringPin
Page 1: ...Service Manual February 2019 55 900001 000 StringPin Pinsetter Ten Pin...
Page 6: ...6 StringPin Pinsetter Service Manual Intentionally Blank Page...
Page 35: ...Section 2 Overview 2 25 1 REAR ACCESS Figure 2 25 Machine Rear Access 1 REAR ACCESS...
Page 40: ...2 30 Section 2 Overview Intentionally Blank Page...
Page 102: ...4 16 Section 4 Adjustments Intentionally Blank Page...
Page 112: ...5 10 Section 5 Maintenance Service Intentionally Blank Page...
Page 126: ...7 8 Section 7 Cables Intentionally Blank Page...