3-12
210 Montauk
Section 3 • Systems & Components Overview & Operation
R
Fresh Water Shower
The fresh water
shower is located
on the port side
of the motorwell.
The shower hose
extends about 6
ft. (1.82m). The
shower unit is
pressurized by the
fresh water pump
and the spray head
is activated by
twisting the center of the unit.
Fresh Water Pump
The freshwater pump will need to be activated to
provide pressure to the system. The freshwater pump
is operated by pressing the Fresh water switch on
the optional console switch panel (Fig. 2.13.2). This
draws water from the holding tank and provides
pressure to the shower.
Environmental Considerations
The Environmental Protection Agency (EPA)
standards state that in freshwater lakes, reservoirs,
impoundments whose inlets or outlets are such as
to prevent the ingress or egress by vessel traffic
subject to this regulation, or in rivers not capable
of navigation by interstate traffic subject to this
regulation, marine sanitation certified by the United
States Coast Guard (U.S.C.G.) installed on vessels
shall be designed and operated to prevent the
overboard discharge of sewage, treated or untreated
or any other waste derived from sewage.
The EPA standards further state that this shall
not be construed to prohibit the carriage of Coast
Your boat may be equipped with a portable waste
containment system with deck pump out. The system
has a lower tank and an upper tank. Waste is directed
to the lower section of the tank which has a holding
capacity of 2.8 gal. (10.6L).
Complete operating and maintenance instructions can
be found in the manufacturers operations manual.
Head System (option)
Severe state and federal penalties are levied
for discharging raw sewage and solid waste
in waters where it is not permitted.
NOTICE
Dockside Discharge
The dockside discharge deck plate is located on
the port side of the center console and is marked
“WASTE”. Access is gained by use of a special key
that is included in the owner’s manual packet.
Portable Head with Pump-Out
Maintenance
Very little maintenance is required for the freshwater
system, other than annual disinfecting and winterizing.
Periodically check the entire system to assure that the
hose connections, tube fittings, electrical connections
and mounting bolts are properly secured, and free
of chafing
Portable Head Unit
Fig. 3.12.1
1
2
PORTABLE HEAD UNIT
WASTE CONTAINMENT UNIT
UPPER UNIT
DOCKSIDE PUPMOUT DECK PLATE
WASTE SYSTEM VENT
3
4
2
3
1
5
4
5
4
5
Summary of Contents for 210 Montauk
Page 1: ...210 Montauk Owner s Manual ...
Page 43: ...1 22 210 Montauk Section 1 Safety R THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 94: ...4 7 210 Montauk Section 4 Electrical System R 12 VDC Wiring Diagram Sheet 1 Fig 4 7 1 ...
Page 95: ...4 8 210 Montauk Section 4 Electrical System R 12 VDC Wiring Diagram Sheet 2 Fig 4 8 1 ...
Page 98: ...4 11 210 Montauk Section 4 Electrical System R T Top Harness Fig 4 11 1 ...
Page 99: ...4 12 210 Montauk Section 4 Electrical System R THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 111: ...5 12 Section 5 Care Maintenance R 210 Montauk Reinforcement Location Diagram ...
Page 113: ...5 14 Section 5 Care Maintenance R 210 Montauk THIS PAGE INTENTIONALLY LEFT BLANK ...