
3-4
Safety Instructions for Electric Drives and Controls
BTV30.2
DOK-MTC200-BTV30.2****-PR02-EN-P
•
Operation is only permitted if the national EMC regulations for the
application are met.
The instructions for installation in accordance with EMC requirements
can be found in the documentation "EMC in Drive and Control
Systems".
The machine or installation manufacturer is responsible for
compliance with the limiting values as prescribed in the national
regulations.
•
Technical data, connections and operational conditions are specified in
the product documentation and must be followed at all times.
Summary of Contents for Rexroth Indramat BTV30.2
Page 1: ...Project Planning Manual DOK MTC200 BTV30 2 PR02 EN P SYSTEM200 BTV30 2 ...
Page 6: ...IV Contents BTV30 2 DOK MTC200 BTV30 2 PR02 EN P ...
Page 26: ...4 4 Technical Data BTV30 2 DOK MTC200 BTV30 2 PR02 EN P ...
Page 30: ...5 4 Dimensions BTV30 2 DOK MTC200 BTV30 2 PR02 EN P ...
Page 38: ...6 8 Front Panel Keyboard BTV30 2 DOK MTC200 BTV30 2 PR02 EN P ...
Page 44: ...7 6 Connection Pin Assignment BTV30 2 DOK MTC200 BTV30 2 PR02 EN P ...
Page 48: ...8 4 Application Example BTV30 2 DOK MTC200 BTV30 2 PR02 EN P ...
Page 68: ...10 6 Ordering Information BTV30 2 DOK MTC200 BTV30 2 PR02 EN P ...
Page 78: ...11 10 Accessories BTV30 2 DOK MTC200 BTV30 2 PR02 EN P ...
Page 80: ...12 2 Included Equipment BTV30 2 DOK MTC200 BTV30 2 PR02 EN P ...
Page 86: ...14 4 Index BTV30 2 DOK MTC200 BTV30 2 PR02 EN P ...
Page 93: ......