19
C
OM
M
IS
ION
ING
S
Function Test
OK
o
Check elevator opens by hydraulic pressure.
OK
o
Check feedback signal indicates elevator closed and latched.
OK
o
Check required bushings are installed before first use
OK
o
Check all bushing segments are of same size and serial number elevator
OK
o
Check if bushings are fixed correctly
OK
o
Check 18° shoulder with gauge P/N 600168 for wear
OK
o
Check all safety / lock wire is present.
OK
o
Check if feedback valve is present.
OK
o
Check elevator closes by hydraulic pressure.
OK
o
Pick up a pipe.
OK
o
Check if elevator opens after giving command “open elevator”
Summary of Contents for 613000-Y-H-F
Page 8: ...8 ...
Page 9: ...9 DESCRIPTION DESCRIPTION ...
Page 16: ...16 DESCRIPTION ...
Page 17: ...17 COMMISIONINGS COMMISIONING COMMISSIONING ...
Page 20: ...20 COMMISIONINGS ...
Page 21: ...21 INSTALLATION INSTALLATION ...
Page 27: ...27 OPERATIONS OPERATIONS ...
Page 29: ...29 MAINTENANCE INSPECTION MAINTENANCE INSPECTION ...
Page 43: ...43 SIZE COMPONENTS SIZE COMPONENTS ...
Page 46: ...46 ...
Page 47: ...47 DRAWINGS SPARE PARTS DRAWINGS SPARE PARTS ...
Page 51: ...51 DRAWINGS SPARE PARTS PN 613040 Mechanic Kit D 29 31 D 2 5 31 31 18 3 ...
Page 52: ...52 DRAWINGS SPARE PARTS 570 9 27 7 21 11 4 25 8 1 28 6 22 5 131 87 238 85 23 5 ...
Page 53: ...53 DRAWINGS SPARE PARTS 25 12 25 26 9 24 19 10 30 50 18 23 C 1 2 16 17 13 14 15 ...
Page 62: ...62 DRAWINGS SPARE PARTS ...