26
IN
S
TA
LL
A
TI
ON
Installation Checklist
Basically the elevator has to be installed as shown in the manual.
OK
o
Make sure the required bushings are installed before first use
OK
o
Make sure the bushings are fixated with the screws & lock wired
OK
o
Check 18° shoulder with gauge P/N 600168 for wear
OK
o
Make sure the feedback valve is correctly adjusted.
OK
o
Make sure the hydraulic pressure is switched on.
Hydraulic Connections
OK
o
Make sure QD`s are clean.
OK
o
Make sure the controls are connected to the Hydraulic Power Supply.
OK
o
Make sure the controls are switched on.
OK
o
Make sure the Hydraulic Lines are connected.
Function test
OK
o
Close elevator.
OK
o
Open elevator.
OK
o
Check signal elevator closed and latched“ is present.
OK
o
Check loose service tools are removed from the elevator.
Summary of Contents for 613000-Y-H-F
Page 8: ...8 ...
Page 9: ...9 DESCRIPTION DESCRIPTION ...
Page 16: ...16 DESCRIPTION ...
Page 17: ...17 COMMISIONINGS COMMISIONING COMMISSIONING ...
Page 20: ...20 COMMISIONINGS ...
Page 21: ...21 INSTALLATION INSTALLATION ...
Page 27: ...27 OPERATIONS OPERATIONS ...
Page 29: ...29 MAINTENANCE INSPECTION MAINTENANCE INSPECTION ...
Page 43: ...43 SIZE COMPONENTS SIZE COMPONENTS ...
Page 46: ...46 ...
Page 47: ...47 DRAWINGS SPARE PARTS DRAWINGS SPARE PARTS ...
Page 51: ...51 DRAWINGS SPARE PARTS PN 613040 Mechanic Kit D 29 31 D 2 5 31 31 18 3 ...
Page 52: ...52 DRAWINGS SPARE PARTS 570 9 27 7 21 11 4 25 8 1 28 6 22 5 131 87 238 85 23 5 ...
Page 53: ...53 DRAWINGS SPARE PARTS 25 12 25 26 9 24 19 10 30 50 18 23 C 1 2 16 17 13 14 15 ...
Page 62: ...62 DRAWINGS SPARE PARTS ...