2. COMMISSIONING
Commissioning VES-HCL 350 Center latch Elevator
Blohm + Voss strongly recommends to accomplish the Elevator commissioning with the
Blohm + Voss Commissioning.
Read manual before first use !
OK
o
Check crew is aware of all danger regarding handling the B+V tool.
OK
o
Go through manual with crew.
Prior to use of the Blohm+Voss Elevator following checks must be carried out :
Scope of supply
OK
o
Cross check all delivered parts
Hydraulic Characteristics
OK
o
Operating pressure
130 bar / 1885 PSI
OK
o
Volumetric flow
6.6 Gpm (25 l/m) to 25 Gpm (94 l/m)
OK
o
Hydraulic filter and regulator
Filter installed in pressure line
Check and Lubrication
OK
o
Check for any damage and repair if needed
OK
o
Check elevator is in closed position.
OK
o
Check for correct seating of Hinge Pin and Latch Pin.
OK
o
Check Hydraulic Supply lines are disconnected.
OK
o
Apply grease to all greasing points until grease is visibly coming out of the
bores.
OK
o
Check if elevator is installed as outlined in manual.
OK
o
Connect feedback lines.
OK
o
Check of all bolts, nuts, washers and lock wire are in place.
Summary of Contents for 613000-Y-H-F
Page 8: ...8 ...
Page 9: ...9 DESCRIPTION DESCRIPTION ...
Page 16: ...16 DESCRIPTION ...
Page 17: ...17 COMMISIONINGS COMMISIONING COMMISSIONING ...
Page 20: ...20 COMMISIONINGS ...
Page 21: ...21 INSTALLATION INSTALLATION ...
Page 27: ...27 OPERATIONS OPERATIONS ...
Page 29: ...29 MAINTENANCE INSPECTION MAINTENANCE INSPECTION ...
Page 43: ...43 SIZE COMPONENTS SIZE COMPONENTS ...
Page 46: ...46 ...
Page 47: ...47 DRAWINGS SPARE PARTS DRAWINGS SPARE PARTS ...
Page 51: ...51 DRAWINGS SPARE PARTS PN 613040 Mechanic Kit D 29 31 D 2 5 31 31 18 3 ...
Page 52: ...52 DRAWINGS SPARE PARTS 570 9 27 7 21 11 4 25 8 1 28 6 22 5 131 87 238 85 23 5 ...
Page 53: ...53 DRAWINGS SPARE PARTS 25 12 25 26 9 24 19 10 30 50 18 23 C 1 2 16 17 13 14 15 ...
Page 62: ...62 DRAWINGS SPARE PARTS ...