The torino
Page 14
Through Roof Framing
Maintain 10” opening relative to the pitch of
the roof.
10” square
Use a suitable round or square support
through the roof. Ensure adequate heat
shield protection is provided.
Termination Above Roof
Consult local codes for minimum vent cap
height above the roof, vent must be a
minimum 2’ from any wall.
install the flashing with upper portion slid
under the roofing material and the lower
portion over the roofing material.
Note: Do not fasten down until the final
adjustments to the vent have been
made.
INSTALLATION INSTRUCTIONS
Cont...
Summary of Contents for TORINO
Page 6: ...The torino Page 6 APPLIANCE DIMENSIONS ...
Page 25: ...The torino Page 25 WIRING DIAGRAM 120 V AC ...
Page 26: ...The torino Page 26 LIGHTING INSTRUCTIONS Intermittent Pilot ...
Page 28: ...The torino Page 28 HANDHELD THERMOSTAT REMOTE CONTROL operation instructions ...
Page 29: ...The torino Page 29 HANDHELD THERMOSTAT REMOTE CONTROL operation instructions ...
Page 30: ...The torino Page 30 HANDHELD THERMOSTAT REMOTE CONTROL operation instructions ...
Page 37: ...The torino Page 37 FUEL CONVERSION ...
Page 47: ...The torino Page 47 ...
Page 48: ...The torino Page 48 NOTES SERVICE HISTORY DATE CORRECTIVE ACTION INCLUDE REPLACEMENT PARTS ...