The torino
Page 36
Conversion Kit Contents
This conversion kit contains the following parts:
1) Z0755P (LPG)> # 59 orifice for the right orifice, # 53 orifice for the left and LPG Stepper motor kit
2) Z0755 (NG)> # 52 orifice for right orifice, # 39 orifice for left and NG Stepper motor kit
3) Conversion Kit labels
To convert from NG to LPG or reverse, follow the next steps
.
- Replace orifices, see page 38 for Burner tray removal &installation.
- Replace stepper motor (see next page).
- Convert pilot fuel (see instructions below)
How to convert Pilot fuel:
Use a 7/16” wrench to loosen the pilot hood
Push the little tab in and the little tab with hole should pop out.
The hole stamp tab (LP) out is used for Propane
The stamped tab (NA) out is for Natural Gas
Re-tighten the pilot hood.
Fill out the fuel conversion label on the appliance (inside side doors)
See page 9 for proper pilot and burner flame pictorials.
All valves have been pre-set and certified for installation at elevations from 0 – 4500 feet (1 – 1372m)
above sea level.
High Elevations
When installing this unit at higher elevations, it is necessary to decrease the input rating by replacing
the existing burner orifice with a smaller size for installations over 2000 feet (608 m). The appliances
input should be reduced 4% for each additional 1000 feet (305 m) above sea level. For the USA, de-
rate the unit from sea level according to the gas installation code.
Altitude
Natural Gas
Orifice Size
Right
Left
Right
Left
0 – 4,500 ft (0 – 1372 m)
52
39
59
53
4,500 – 6,500 ft (1372 – 1981 m)
53
40
60
54
6,500 – 8,000 ft (1981 – 2438 m)
54
41
61
55
Propane
Orifice Size
FUEL CONVERSION
“WARNING”
This conversion kit shall be installed by a qualified service agency in accordance with
the manufacturer’s instructions and all applicable codes and requirements of the
authority having jurisdiction. If the information in these instructions is not followed
exactly, a fire, explosion or production of carbon monoxide may result causing property
damage, personal injury or loss of life. The qualified service agency is responsible for
the proper installation of this kit. The installation is not proper and complete until the
operation of the converted appliance is checked as specified in the manufacturer’s
instructions supplied with the kit.
Summary of Contents for TORINO
Page 6: ...The torino Page 6 APPLIANCE DIMENSIONS ...
Page 25: ...The torino Page 25 WIRING DIAGRAM 120 V AC ...
Page 26: ...The torino Page 26 LIGHTING INSTRUCTIONS Intermittent Pilot ...
Page 28: ...The torino Page 28 HANDHELD THERMOSTAT REMOTE CONTROL operation instructions ...
Page 29: ...The torino Page 29 HANDHELD THERMOSTAT REMOTE CONTROL operation instructions ...
Page 30: ...The torino Page 30 HANDHELD THERMOSTAT REMOTE CONTROL operation instructions ...
Page 37: ...The torino Page 37 FUEL CONVERSION ...
Page 47: ...The torino Page 47 ...
Page 48: ...The torino Page 48 NOTES SERVICE HISTORY DATE CORRECTIVE ACTION INCLUDE REPLACEMENT PARTS ...