The torino
Page 13
INSTALLATION INSTRUCTIONS
Cont...
Vertical Installations
Always maintain the 1” clearance around the vent pipe (vertical), when passing through
ceilings, walls, roofs, enclosures, attic rafters or any combustible surfaces.
DO NOT PACK AIR SPACES WITH INSULATION.
Refer to the vent chart for maximum allowable vertical and horizontal installations.
When planning your installation determine if ceiling joists, roof rafters or other framing will
obstruct the vent system. You may have to use 45° elbows to navigate around any obstacles.
When passing through a flat ceiling install a Box/Wall thimble. Cut a 10” square hole and frame
as shown in the diagram opposite.
Ensure all pipe sections are fully twist locked.
NOTE: ALWAYS CHECK YOUR LOCAL CODES BEFORE INSTALLING VENTING.
NECESSARY CLEARANCES AND REQUIRMENTS MAY VARY FROM STATE TO STATE
(PROVINCE TO PROVINCE).
Summary of Contents for TORINO
Page 6: ...The torino Page 6 APPLIANCE DIMENSIONS ...
Page 25: ...The torino Page 25 WIRING DIAGRAM 120 V AC ...
Page 26: ...The torino Page 26 LIGHTING INSTRUCTIONS Intermittent Pilot ...
Page 28: ...The torino Page 28 HANDHELD THERMOSTAT REMOTE CONTROL operation instructions ...
Page 29: ...The torino Page 29 HANDHELD THERMOSTAT REMOTE CONTROL operation instructions ...
Page 30: ...The torino Page 30 HANDHELD THERMOSTAT REMOTE CONTROL operation instructions ...
Page 37: ...The torino Page 37 FUEL CONVERSION ...
Page 47: ...The torino Page 47 ...
Page 48: ...The torino Page 48 NOTES SERVICE HISTORY DATE CORRECTIVE ACTION INCLUDE REPLACEMENT PARTS ...