MK / MKT (E5) 03/2019
page 38/158
5.8
Performance when opening the door
When you open the door the fan starts running with minimum speed (30 %).
After 60 seconds from opening the door, heating, refrigeration, and fan turn off. The compressor contin-
ues operating during 5 minutes without cooling function.
After closing the door, heating, refrigeration, and fan turn on again.
6.
Start up
6.1
Turning on the chamber
After connecting the electrical supply (chap. 4), you can start up the chamber.
•
MK 56:
Turn on the main power switch (1) in the lateral control panel at least one hour before operat-
ing the chamber
.
•
MK/MKT 115, 240, 720:
Turn on the main power switch (1) in the lateral control panel and the rear
power switch (12) at least one hour before operating the chamber
The lit pilot lamp shows the chamber is ready for operation. When the chamber is turned on and yet the
controller display is dark, the display is in stand-by mode. Press on the touchscreen to activate it.
MK 56:
The refrigerating function is available only one hour after turning on the main power switch (1).
This is indicated by the notification “Preheating phase” in the controller display.
MK/MKT 115, 240, 720:
The refrigerating function is available only one hour after turning on the main
power switch (1) and the rear power switch (12). This is indicated by the information message “Preheating
phase” in the controller display.
Warming chambers may release odors in the first few days after commissioning. This is not a quality de-
fect. To reduce odors quickly we recommend heating up the chamber to its nominal temperature for one
day and in a well-ventilated location.
For control reasons the refrigeration machine starts with a delay time. The refrigeration ma-
chine also turns off with a 5 minutes delay. This explains why the compressor may remain
operating also during positive temperature jumps.
Summary of Contents for MK 115
Page 138: ...MK MKT E5 03 2019 page 138 158 24 12 Dimensions MK 56 dimensions mm ...
Page 139: ...MK MKT E5 03 2019 page 139 158 MK MKT 115 dimensions mm ...
Page 140: ...MK MKT E5 03 2019 page 140 158 MK 240 dimensions mm ...
Page 141: ...MK MKT E5 03 2019 page 141 158 MKT 240 dimensions mm ...
Page 142: ...MK MKT E5 03 2019 page 142 158 MK MKT 720 dimensions mm ...
Page 144: ...MK MKT E5 03 2019 page 144 158 ...
Page 145: ...MK MKT E5 03 2019 page 145 158 ...
Page 146: ...MK MKT E5 03 2019 page 146 158 25 2 EU Declaration of Conformity for MKT ...
Page 147: ...MK MKT E5 03 2019 page 147 158 ...
Page 148: ...MK MKT E5 03 2019 page 148 158 ...
Page 150: ...MK MKT E5 03 2019 page 150 158 ...
Page 151: ...MK MKT E5 03 2019 page 151 158 26 Product registration 26 1 Registering a BINDER chamber ...
Page 159: ......