
MK / MKT (E5) 03/2019
page 2/158
Contents
1.
SAFETY .................................................................................................................. 6
1.1
Legal considerations ........................................................................................................................... 6
1.2
Structure of the safety instructions ...................................................................................................... 6
1.2.1
Signal word panel ...................................................................................................................... 6
1.2.2
Safety alert symbol .................................................................................................................... 7
1.2.3
Pictograms ................................................................................................................................ 7
1.2.4
Word message panel structure ................................................................................................. 8
1.3
Localization / position of safety labels on the chamber ....................................................................... 8
1.4
Type plate ............................................................................................................................................ 9
1.5
General safety instructions on installing and operating the chamber ................................................ 10
1.6
Intended use ...................................................................................................................................... 12
1.7
Operating instructions ....................................................................................................................... 13
1.8
Measures to prevent accidents ......................................................................................................... 13
2.
CHAMBER DESCRIPTION .................................................................................. 14
2.1
Chamber overview ............................................................................................................................ 15
2.2
Instrument panel................................................................................................................................ 15
2.3
Lateral control panel .......................................................................................................................... 16
2.4
Main power switch (MK 56) ............................................................................................................... 17
2.5
Rear power switch (MK / MKT 115, 240, 720) .................................................................................. 17
2.6
Rear chamber view ........................................................................................................................... 18
3.
COMPLETENESS OF DELIVERY, TRANSPORTATION, STORAGE, AND
INSTALLATION .................................................................................................... 20
3.1
Unpacking, and checking equipment and completeness of delivery................................................. 20
3.2
Guidelines for safe lifting and transportation ..................................................................................... 21
3.3
Storage .............................................................................................................................................. 21
3.4
Location of installation and ambient conditions ................................................................................. 21
4.
INSTALLATION AND CONNECTIONS ................................................................ 23
4.1
Connection of cooling water outlet for water cooling (option for MK 56) ........................................... 23
4.2
Connection of cooling water inlet for water cooling (option for MK 56) ............................................. 23
4.3
Installation of the voltage and frequency changer (chambers with voltage and frequency changer) 24
4.4
Electrical connection ......................................................................................................................... 26
4.4.1
Information on connecting the alternating climate chamber ................................................... 26
4.4.2
Connecting the voltage and frequency changer (for chambers equipped with a voltage and
frequency changer) ................................................................................................................. 27
5.
FUNCTIONAL OVERVIEW OF THE MB2 CHAMBER CONTROLLER ............... 28
5.1
Operating functions in normal display ............................................................................................... 29
5.2
Display views: Normal display, program display, chart-recorder display ........................................... 30
5.3
Controller icons overview .................................................................................................................. 31
5.4
Operating modes ............................................................................................................................... 33
5.5
Controller menu structure .................................................................................................................. 34
5.5.1
Main menu .............................................................................................................................. 35
5.5.2
“Settings” submenu ................................................................................................................. 36
5.5.3
“Service” submenu .................................................................................................................. 36
5.6
Principle of controller entries ............................................................................................................. 37
5.7
Performance during and after power failures .................................................................................... 37
5.8
Performance when opening the door ................................................................................................ 38
6.
START UP ............................................................................................................ 38
6.1
Turning on the chamber .................................................................................................................... 38
6.2
Controller settings upon start up ....................................................................................................... 39
Summary of Contents for MK 115
Page 138: ...MK MKT E5 03 2019 page 138 158 24 12 Dimensions MK 56 dimensions mm ...
Page 139: ...MK MKT E5 03 2019 page 139 158 MK MKT 115 dimensions mm ...
Page 140: ...MK MKT E5 03 2019 page 140 158 MK 240 dimensions mm ...
Page 141: ...MK MKT E5 03 2019 page 141 158 MKT 240 dimensions mm ...
Page 142: ...MK MKT E5 03 2019 page 142 158 MK MKT 720 dimensions mm ...
Page 144: ...MK MKT E5 03 2019 page 144 158 ...
Page 145: ...MK MKT E5 03 2019 page 145 158 ...
Page 146: ...MK MKT E5 03 2019 page 146 158 25 2 EU Declaration of Conformity for MKT ...
Page 147: ...MK MKT E5 03 2019 page 147 158 ...
Page 148: ...MK MKT E5 03 2019 page 148 158 ...
Page 150: ...MK MKT E5 03 2019 page 150 158 ...
Page 151: ...MK MKT E5 03 2019 page 151 158 26 Product registration 26 1 Registering a BINDER chamber ...
Page 159: ......