MK / MKT (E5) 03/2019
page 105/158
19. Zero-voltage switching outputs via operation lines
The chambers are equipped regularly (MKT) or optionally (MK) with four zero-voltage switching outputs
(DIN sockets (7) and (8) located in the lateral control panel).
The operation lines serve to switch any device connected to the zero-voltage relay output. They can be
programmed On/Off in Fixed value and program modes.
Connection for operation lines “Switching output 1” and “2” occurs via DIN socket (7), connection for oper-
ation lines “Switching output 3” and “4” via DIN socket (8) in the lateral control panel:
OUTPUT TRACK 1+2
24V/MAX.2,5A
OUTPUT TRACK 3+4
24V/MAX.2,5A
Figure 16: Pin configuration of DIN sockets (7) left and (8) right
DIN socket (7):
Operation line “Switching output 1”
Operation line “Switching output 2”
Pin 1: Pin
Pin 2: Make
Pin 4: Pin
Pin 5: Make
DIN socket (8):
Operation line “Switching output 3”
Operation line “Switching output 4”
Pin 1: Pin
Pin 2: Make
Pin 4: Pin
Pin 5: Make
Maximum loading capacity of the switching contacts: 24V AC/DC – 2.5 A
DANGER
Electrical hazard.
Danger of death.
Damage to switching contacts and connection socket.
∅
Do NOT exceed the maximum switching load of 24V AC/DC – 2.5A.
∅
Do NOT connect any devices with a higher loading capacity.
4
5
1
2
4
5
1
2
Summary of Contents for MK 115
Page 138: ...MK MKT E5 03 2019 page 138 158 24 12 Dimensions MK 56 dimensions mm ...
Page 139: ...MK MKT E5 03 2019 page 139 158 MK MKT 115 dimensions mm ...
Page 140: ...MK MKT E5 03 2019 page 140 158 MK 240 dimensions mm ...
Page 141: ...MK MKT E5 03 2019 page 141 158 MKT 240 dimensions mm ...
Page 142: ...MK MKT E5 03 2019 page 142 158 MK MKT 720 dimensions mm ...
Page 144: ...MK MKT E5 03 2019 page 144 158 ...
Page 145: ...MK MKT E5 03 2019 page 145 158 ...
Page 146: ...MK MKT E5 03 2019 page 146 158 25 2 EU Declaration of Conformity for MKT ...
Page 147: ...MK MKT E5 03 2019 page 147 158 ...
Page 148: ...MK MKT E5 03 2019 page 148 158 ...
Page 150: ...MK MKT E5 03 2019 page 150 158 ...
Page 151: ...MK MKT E5 03 2019 page 151 158 26 Product registration 26 1 Registering a BINDER chamber ...
Page 159: ......