5 Explosion Protection
1
5.8.2
Plan for Inspection of the Terminal Compart-
ment
If you answer one of the following questions with "No", you have to
record the action you have taken to remedy this deficiency in the
last column. Make sure before you take the device into operation
again that the provisions you have taken are correct by consulting
with the person in charge of explosion protection.
Date: ...............................................
Name:.................................................
Yes
No
Measures
Test in the terminal compartment
Is the interior (terminal compartment) in
perfect order?
Is the interior dry, clean and free of foreign
material?
Are the cables connected firmly?
Are the terminals in perfect order?
Is the interior free of corrosion?
Is the insulation free of damages or trails?
Is the mechanical fastening of the fixtures
in good working order?
Is the detector installed according to the
local constructor regulations
(e.g. EN 60079-14)?
Does the cable insulation extend into the
terminal compartment?
Does the wire isolation reach into the sleeve
of the terminals, respectively the sleeve of
the ferrules?
When using ferrules: Does the sleeve of the
ferrule extend into the terminal sleeve?
Are all the wires of a fine-wire strand cov-
ered by the terminal and clamped?
Is the grounding conductor properly
installed?
Is the screened cable properly insulated
electrically up to the terminal (e.g. with
shrink tubing)?
Summary of Contents for LB 480
Page 2: ......
Page 11: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 1 Safety Manual...
Page 12: ...54733 10BA2L 1 12 02 2017 Volume 1...
Page 22: ...54733 10BA2L 1 22 02 2017 4 Transport and Assembly Volume 1...
Page 56: ...54733BA26 1 56 02 2017 5 Explosion Protection Volume 1...
Page 57: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 57 Volume 1 5 Explosion Protection 1...
Page 58: ...54733BA26 1 58 02 2017 5 Explosion Protection Volume 1...
Page 59: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 59 Volume 1 5 Explosion Protection 1...
Page 60: ...54733BA26 1 60 02 2017 5 Explosion Protection Volume 1...
Page 61: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 61 Volume 1 5 Explosion Protection 1...
Page 62: ...54733BA26 1 62 02 2017 5 Explosion Protection Volume 1...
Page 63: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 63 Volume 1 5 Explosion Protection 1...
Page 64: ...54733BA26 1 64 02 2017 5 Explosion Protection Volume 1...
Page 66: ...54733BA26 1 66 02 2017 5 Explosion Protection Volume 1...
Page 67: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 67 Volume 1 5 Explosion Protection 1...
Page 68: ...54733BA26 1 68 02 2017 5 Explosion Protection Volume 1...
Page 69: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 69 Volume 1 5 Explosion Protection 1...
Page 70: ...54733BA26 1 70 02 2017 5 Explosion Protection Volume 1...
Page 71: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 71 Volume 1 5 Explosion Protection 1...
Page 72: ...54733BA26 1 72 02 2017 5 Explosion Protection Volume 1...
Page 73: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 73 Volume 1 5 Explosion Protection 1...
Page 108: ...54733 10BA2L 1 108 02 2017 7 Functional Safety Volume 1 7 13 Functional Safety Certificate...
Page 110: ...54733 10BA2L 1 110 02 2017 7 Functional Safety Volume 1...
Page 112: ...54733 10BA2L 1 112 02 2017 8 Visual Inspection Volume 1...
Page 128: ...54733 10BA2L 1 128 02 2017 9 Radiation Protection Volume 1...
Page 147: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 147 Volume 1 1 Notes...
Page 149: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 2 Installing SENSseries...
Page 150: ...54733 10BA2L 2 150 02 2017 Volume 2...
Page 170: ...54733 10BA2L 2 170 02 2017 1 System Description Volume 2...
Page 240: ...54733 10BA2L 2 240 02 2017 4 Repair Maintenance and Upkeep Volume 2...
Page 288: ...54733 10BA2L 2 288 02 2017 5 Technical Information Volume 2...
Page 297: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 2 297 Volume 2 2 Notes...
Page 299: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 3 Operation with HART Communicator...
Page 300: ...54733 10BA2L 3 300 02 2017 Volume 3...
Page 390: ...54733 10BA2L 3 390 02 2017 3 Getting Started via the HART Communicator Volume 3...
Page 410: ...54733 10BA2L 3 410 02 2017 6 Functional Processes Volume 3...
Page 428: ...54733 10BA2L 3 428 02 2017 7 Explanations Volume 3...
Page 440: ...54733 10BA2L 3 440 02 2017 8 Error Handling Volume 3...
Page 444: ...54733 10BA2L 3 444 02 2017 9 Setup Protocol Volume 3 Path Parameters Unit Standard SETUP...
Page 445: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 3 445 Volume 3 3 Notes...
Page 449: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 449 Volume 1 Notes...