Specifications
Unit
Total system output
≤ 70 kW
Total water hardness
°f
7 - 15
°dH
4 - 8.5
mmol/l
0.7 - 1.5
Important
If water treatment proves necessary, Baxi recommends the
following manufacturers:
Cillit
Climalife
Fernox
Permo
Sentinel
6.9.2
Filling the heating circuit
Before filling the heating system, flush it thoroughly.
Important
Do not use glycol.
The use of glycol in the heating circuit invalidates the warranty.
1. Fill the installation until a pressure of 0.15 to 0.2 MPa (1.5 to 2 bar) is
achieved. Read the pressure on the main screen of the control panel.
2. Check for any water leaks.
3. Completely vent the indoor module and the installation for optimum
running.
Flushing new installations and installations less than 6 months
old
1. Clean the installation with a powerful universal cleaner to eliminate
debris from the system (copper, hemp, flux).
2. Thoroughly flush the installation until the water runs clear and shows
no impurities.
Flushing an existing installation
1. Remove any sludge from the installation.
2. Flush the installation.
3. Clean the installation with a universal cleaner to eliminate debris from
the system (copper, hemp, flux).
4. Thoroughly flush the installation until the water runs clear and shows
no impurities.
6 Installation
46
iHPI
7701563 - v02 - 22052018