7.6 Gas Supply
1. The gas installation should be in accordance with the current edition of I.S. 813.
2. The connection to the appliance is a 3/4" copper tail located at the rear of the gas service
cock (
Fig. 7
).
Fig. 7
3. Ensure that the pipework from the meter to the appliance is of adequate size. Do not use
pipes of a smaller diameter than the boiler gas connection (3/4").
7.7 Electrical Supply
1. External wiring must be correctly earthed, polarised and in accordance with current edition
of the ETCI Rules.
2. The mains supply must be 230V ~ 50H
z
and fused at 3A maximum.
NOTE: The method of connection to the electricity supply must facilitate
complete electrical isolation of the appliance.
Connection may be via a fused double-pole isolator with a contact separation
of at least 3mm in all poles and servicing the boiler and system controls only.
Summary of Contents for 35/80 IE
Page 15: ...F 190mm G 143mm ...
Page 20: ...Fig 5 ...
Page 51: ......
Page 55: ......
Page 57: ......
Page 59: ......
Page 67: ...br brown bk black b blue r red g green g y green yellow w white Page 39 14 0 Fault Finding ...
Page 69: ...Page 40 Fault Finding Solutions Sections A to E ...
Page 70: ...Page 41 ...
Page 71: ......
Page 73: ......
Page 74: ......