3. Slacken the pressure test point sealing screw on the gas valve and connect a pressure
gauge (
Fig. 33
).
4. Undo the screws securing the inner door panel. Lift the panel slightly to disengage it from
the studs on top of the case.
5.
IMPORTANT: Turn the selector switch fully anticlockwise against the spring
pressure to position R and hold for at least 3 seconds to reset the boiler.
6. Turn the selector switch to the Cental Heating and Domestic Hot Water position (
).
The power On neon (
) will illuminate (
Fig. 36
).
Summary of Contents for 35/80 IE
Page 15: ...F 190mm G 143mm ...
Page 20: ...Fig 5 ...
Page 51: ......
Page 55: ......
Page 57: ......
Page 59: ......
Page 67: ...br brown bk black b blue r red g green g y green yellow w white Page 39 14 0 Fault Finding ...
Page 69: ...Page 40 Fault Finding Solutions Sections A to E ...
Page 70: ...Page 41 ...
Page 71: ......
Page 73: ......
Page 74: ......