![Baxi 35/80 IE Installation & Servicing Instructions Manual Download Page 50](http://html.mh-extra.com/html/baxi/35-80-ie/35-80-ie_installation-and-servicing-instructions-manual_2711660050.webp)
16. Ensure that the heat exchanger fins are clear of any obstruction.
17. Check that the pressure vessel charge is 0.5bar and reassemble in reverse order of
dismantling.
18. Turn the selector switch fully anticlockwise against the spring pressure to position R and
hold for at least 3 seconds to reset the boiler before recommissioning.
Page 30
12.0 Changing Components
IMPORTANT:
When changing components ensure that both the gas and electrical
supplies to the boiler are isolated before any work is started. When the new
component has been fitted turn the selector switch fully anticlockwise against the
spring pressure to position R and hold for at least 3 seconds to reset the boiler before
recommissioning.
See
Section 11.1
"Annual Servicing" for removal of case panel, door etc.
12.1 Pressure Switch (
Fig. 44
)
Summary of Contents for 35/80 IE
Page 15: ...F 190mm G 143mm ...
Page 20: ...Fig 5 ...
Page 51: ......
Page 55: ......
Page 57: ......
Page 59: ......
Page 67: ...br brown bk black b blue r red g green g y green yellow w white Page 39 14 0 Fault Finding ...
Page 69: ...Page 40 Fault Finding Solutions Sections A to E ...
Page 70: ...Page 41 ...
Page 71: ......
Page 73: ......
Page 74: ......