![Baxi 35/80 IE Installation & Servicing Instructions Manual Download Page 29](http://html.mh-extra.com/html/baxi/35-80-ie/35-80-ie_installation-and-servicing-instructions-manual_2711660029.webp)
7. Drill the wall as previously marked to accept the wall plugs supplied. Secure the wall plate
using the fixing screws.
8. Using a spirit level ensure that the plate is level before finally tightening the screws.
9. Connect the gas and water pipes to the valves on the wall plate using the copper tails
supplied. Ensure that the sealing washers are fitted between the connections.
8.2 Flushing
1. Connect a tube to the central heating flow or return pipe (
Fig. 15
).
Fig. 15
2. Flush thoroughly (see System Details,
Section 6.1
).
8.3 Preparing The Boiler
1. Remove all packaging.
2. Stand the boiler on its base by using the rear lower edge as a pivot.
NOTE:
A small amount of water may drain from the boiler in the upright position.
Baxi declare that no substances harmful to health are contained in the appliance or
used during appliance manufacture.
Page 17
8.4 Fitting The Boiler
1. Remove the sealing caps from the boiler connections.
2. Lift the boiler using the lower edges. Engage the slots at the top rear of the boiler on the
wall plate (
Fig. 16
).
Summary of Contents for 35/80 IE
Page 15: ...F 190mm G 143mm ...
Page 20: ...Fig 5 ...
Page 51: ......
Page 55: ......
Page 57: ......
Page 59: ......
Page 67: ...br brown bk black b blue r red g green g y green yellow w white Page 39 14 0 Fault Finding ...
Page 69: ...Page 40 Fault Finding Solutions Sections A to E ...
Page 70: ...Page 41 ...
Page 71: ......
Page 73: ......
Page 74: ......