![Baxi 35/80 IE Installation & Servicing Instructions Manual Download Page 42](http://html.mh-extra.com/html/baxi/35-80-ie/35-80-ie_installation-and-servicing-instructions-manual_2711660042.webp)
Fig. 29
5. Lay the input cable in the cut out in the relay PCB housing and refit the cover and screws.
6. Ensure that the input cable has sufficient slack to allow the control box to drop down.
Tighten the cable clamp on the boiler chassis.
8.11 Preliminary Electrical Checks
1. Prior to commissioning the boiler preliminary electrical system checks should be carried
out.
2. These should be performed using a suitable meter, and include checks for Ground
Continuity, Resistance to Ground, Short Circuit and Polarity.
Page 25
Summary of Contents for 35/80 IE
Page 15: ...F 190mm G 143mm ...
Page 20: ...Fig 5 ...
Page 51: ......
Page 55: ......
Page 57: ......
Page 59: ......
Page 67: ...br brown bk black b blue r red g green g y green yellow w white Page 39 14 0 Fault Finding ...
Page 69: ...Page 40 Fault Finding Solutions Sections A to E ...
Page 70: ...Page 41 ...
Page 71: ......
Page 73: ......
Page 74: ......