Fig. 18
4. Taking the air duct, mark dimension 'X' as shown (
Fig. 19
). Measure the length of waste
material, and transfer the dimension to the flue duct (
Fig. 19
).
Fig. 19
IMPORTANT:
Check all measurements before cutting.
5. Remove the waste from both ducts. Ensure that the cut ends are square and free from
burrs.
Summary of Contents for 35/80 IE
Page 15: ...F 190mm G 143mm ...
Page 20: ...Fig 5 ...
Page 51: ......
Page 55: ......
Page 57: ......
Page 59: ......
Page 67: ...br brown bk black b blue r red g green g y green yellow w white Page 39 14 0 Fault Finding ...
Page 69: ...Page 40 Fault Finding Solutions Sections A to E ...
Page 70: ...Page 41 ...
Page 71: ......
Page 73: ......
Page 74: ......