Operation
Instruction handbook
b maXX
BM3000, BM3200, BM3300
Document no. 5.11018.11
161
8
n
Please, observe an EMC-compatible laying of the Ethernet connection cables!
n
The following cables were released for use by Baumüller:
Ethernet connection cable;
Cables - EtherCAT®, VARAN, POWERLINK® .
Commissioning
.
The following preconditions must be fulfilled before commissioning:
1 BM3200, BM3300
with VARAN is installed correctly.
n
Ethernet connection cables are wired correctly.
2
The control cabinet is properly locked and all safety devices are operating.
3
The
BM3200, BM3300
device is ready-to-use.
4
Create a Lasal-Class2 project using the driver classes for
BM3200, BM3300
drives for
cyclic and service data communication.
5
Start the VARAN control
Address switch
By means of the address switches S1 to S4 the IP-address is set
(See settings
Setting the IP address with address switches
Parameters
The parameter settings determine the behavior of the VARAN-Slave in operation. Param-
eters are set with the software ProDrive.
1
Start ProDrive
2
Click on „Project Tree“.
3
Communication settings with ProDrive
n
Project Tree: Configuration/Fieldbus Slave
(refer also Parameter manual
BM3200, BM3300
)
m
set Synchronization to „On“
m
set Fieldbus cycle time according VARAN cycle time (1 ms, 2 ms, 4 ms or 8 ms)