Operation manual for
BAUER RAINSTAR
Series T32, T42
57
10 WINDING
MECHANISM
The winding mechanism operates synchronously with the winding or unwinding of the PE-pipe. Starting
from the reel it is operated through a chain and the helically grooved spindle transporting the winding
carriage of the PE-pipe. The winding mechanism ensures that the PE-pipe is properly guided winding for
winding. When you put the machine into operation for the first time, pull off the full length of the PE-pipe to let
it take a circular shape under pressure. This step is essential for trouble-free operation of the winding
mechanism.
10.1 ADJUSTMENT OF THE WINDING MECHANISM
Step 1:
Pull off the PE pipe and position the connecting bend (7) vertically pointing down.
Step 2:
Slacken the winding chain (1) between the reel and the helically grooved spindle (2).
Step 3:
Fasten both guide tubes (4 and 5) symmetrically at distance
X 2
to the guide part (3).
Mount the roller bracket (6) with the roller.
Step 4:
Move the guide part (3) of the winding carriage to the outermost reversing point of the groove to the right by
turning the helically grooved spindle (2) Value
X 1
.