12. Maintenance
W
ARNING
:
Unplug the device from the power outlet before starting the check procedure !
How to check
1. Open the covers of the base unit, yoke and projector head (see chapter Service for more information on how to open the device)
2. Execute a visual inspection of the cable.
3. Use a cotton cloud to check if metal
fi
bres are broken.
Cable 1 starts at point 1, goes through one side of the yoke to the projector head, through the bridge and back through the other
side of the yoke to make a junction in point 4.
Cable 2 starts at point 2 and goes to the corner of the base unit (point 3).
1
2
3
4
Image 12-5
Internal safety cable, routing
70
R59770208 DML-1200 06/11/2009
Summary of Contents for DML-1200
Page 1: ...DML 1200 User guide R9050120 R59770208 04 06 11 2009...
Page 12: ...1 Safety 8 R59770208 DML 1200 06 11 2009...
Page 30: ...4 Connections 26 R59770208 DML 1200 06 11 2009...
Page 32: ...5 Start up of the Adjustment mode 28 R59770208 DML 1200 06 11 2009...
Page 37: ...6 Input menu Image 6 18 Image 6 19 Image 6 20 R59770208 DML 1200 06 11 2009 33...
Page 38: ...6 Input menu 34 R59770208 DML 1200 06 11 2009...
Page 52: ...8 Control menu 48 R59770208 DML 1200 06 11 2009...
Page 62: ...9 Service menu 58 R59770208 DML 1200 06 11 2009...
Page 66: ...10 Moving light control via DMX 62 R59770208 DML 1200 06 11 2009...
Page 76: ...12 Maintenance 72 R59770208 DML 1200 06 11 2009...
Page 98: ...A DMX chart 94 R59770208 DML 1200 06 11 2009...
Page 104: ...C Troubleshooting 100 R59770208 DML 1200 06 11 2009...
Page 106: ...D Specifications 102 R59770208 DML 1200 06 11 2009...
Page 108: ...E Order info 104 R59770208 DML 1200 06 11 2009...