This procedure is the same for PFT, PFI & B&D Storm-Shield
™
PFI doors.
Carefully lower the wheels of the bottom panel into the tracks. The
bottom door panel is to sit level in the door opening. The wheels
are to sit in the “v” groove of the vertical tracks and there should
be clearance between panel and tracks, see Figure 1.6.1.
Now you are ready to install the rest of the panels.
There is a link for every point where there is a stile, which should
all be folded down at this stage.
Insert panel into the guide engaging the wheels into the vertical
tracks, Figure 2.9.3, and nesting the panel onto bottom panels,
Figure 2.9.4. Starting at the centre, lift the panel enough to insert
the link, repeat this one at a time for the remaining links.
Repeat this procedure for all other panels with the exception of
the top panel which has externally mounted adjustable metal
hangers (Figure 2.6.3) these allow for forward and backward
adjustment of the top panel. when finally adjusted the additional
two locking fixings must be added, Figure 2.6.2.
NOTE:
Ensure all white pins are inserted in pFT & pFI panel or
special screws if the panels are insulated, Figure 2.9.1.
FIGURE 2.9.3
FIGURE 2.9.4
FIGURE 2.9.5
FIGURE 2.9.2 LABEL
2.9 ADDING PANELS
NOTE:
Ensure warning label is clearly visible.
FIGURE 2.9.1 ASSEMBLE LINKS
& PINS ONTO THE PANEL
18
panelift
®
pFT, panelift
®
Icon
™
pFI, b&D Storm-Shield
™
pFI and Insul-Shield
™
Installation Instructions
Revision 9 - March 2016