background image

TM

TM

TM

TM

TM

TM

Installation and Operators Manual

Summary of Contents for Turning Point

Page 1: ...TM TM TM TM TM TM Installation and Operators Manual...

Page 2: ......

Page 3: ...pointgateopeners com Safety Considerations 4 5 Installation Instructions 6 13 Tools Needed 6 Pre Installed Considerations 6 Gate Installation Instructions 6 8 Control Box Installation Instructions 9 1...

Page 4: ...e to manual use while the gate is moving 8 Do not add any items to the gate that are not approved for use with this gate system 9 Automated gates are divided into 4 classes per ASTM F2200 and UL 325 s...

Page 5: ...cal codes for any further requirements 20 Warning signs see figure 2 shall be positioned on both sides of each gate and easily visible The signs shall be attached to the gates Signs are supplied with...

Page 6: ...NOTE Check local codes for any specific requirements when routing 12 volt electrical underground 3 Position the bottom hinge of the gate onto the gatepost If this is to be a double drive system start...

Page 7: ...move until it stops b If the gate is moving in the direction opposite what you want to open the gate continue to run the gate till it stops c Remove the power source after the gate stops and manually...

Page 8: ...the gate with top adjustable hinge mount see Figure 8 a To raise the outer edge of the gate turn the top adjustment counter clockwise b To lower the outer edge of the gate turn the top adjustment clo...

Page 9: ...nal marked GATE 2 Again polarity is not critical see section C Control Box Wiring Functions o and p 6 Attach the charging source s to the SOLAR AC terminal A 12 volt AC AC transformer supplied with co...

Page 10: ...e positive wire to the side and the negative wire to the side c Switch System power switch is used to turn the system on and off It will also reset the system Upon power up the system is reset and wil...

Page 11: ...al for gate 2 of a double drive system 3 In the control box cover lid is a small circuit board This is the wireless transmitter receiver see figure E3 It is connected to the circuit board with a three...

Page 12: ...signed to close 4 seconds after the gate close cycle is complete The gate open cycle will also not begin till the power bolt has unlocked Polarity is critical for the power lock a Wires must be run th...

Page 13: ...he electromagnet can be attached to the post where the gate strikes In such a situation attach the magnet receiver on the gate aligned with the electromagnet on the post e Run the wire supplied with t...

Page 14: ...ery Voltage low 1 Readjust potentiometer sensitivity 2 Charge battery and check charging system Gate will not open using wireless transmitter or key pad transmitter 1 Power switch for system not on 2...

Page 15: ...ed areas Approve with this signature date detach and fax this portion of your Operators Manual to 574 546 5099 Property Owner Signature ____________________________________________ Date _____________...

Page 16: ...ct of God The manufacturer will not be responsible for any labor charges incurred in the removal or replacement of defective parts In case of failure due to defective material or workmanship during th...

Page 17: ...___________________________________________________ YOUR _______________________________________________ WARRANTY Location of gate installation if not the same as above address Where Installed Are you...

Page 18: ...P O Box 241 Bremen IN 46506 Phone 574 546 5999 Fax 574 546 5099 www turningpointgateopeners com Place Stamp Here Digger Specialities Inc P O Box 241 Bremen IN 46506...

Page 19: ......

Page 20: ...99705 07 11 11...

Reviews: