3.1
Construction
Fig. 3-1:
35
25
4.1
15.1
25
31
20
Ø ≤ 3.5
Ø ≤ 4.3 (2×)
LED
Start
Construction
3.2
Function
The BIP inductive positioning system detects the position
of the metallic magnet and outputs it as an IO-Link output
signal.
3
Construction and function
6
english
BIP LD2-T017-01-EP _ _ / EP _ _ -S4
Inductive Positioning System
Summary of Contents for BIP LD2-T017-01-EP-S4 Series
Page 2: ...www balluff com...
Page 3: ...BIP LD2 T017 01 EP_ _ BIP LD2 T017 01 EP_ _ S4 Betriebsanleitung deutsch...
Page 4: ...www balluff com...
Page 32: ......
Page 33: ...BIP LD2 T017 01 EP_ _ BIP LD2 T017 01 EP_ _ S4 User s Guide english...
Page 34: ...www balluff com...
Page 62: ......
Page 63: ...BIP LD2 T017 01 EP_ _ BIP LD2 T017 01 EP_ _ S4 Notice d utilisation fran ais...
Page 64: ...www balluff com...
Page 92: ......
Page 93: ...BIP LD2 T017 01 EP_ _ BIP LD2 T017 01 EP_ _ S4 Manuale d uso italiano...
Page 94: ...www balluff com...
Page 122: ......
Page 123: ...BIP LD2 T017 01 EP_ _ BIP LD2 T017 01 EP_ _ S4 Manual de instrucciones espa ol...
Page 124: ...www balluff com...
Page 152: ......
Page 153: ...BIP LD2 T017 01 EP_ _ BIP LD2 T017 01 EP_ _ S4...
Page 154: ...www balluff com...
Page 161: ...5 1 BIP 1 2 3 BIP BIP 5 2 BIP BIP 5 www balluff com 9 BIP LD2 T017 01 EP_ _ EP_ _ S4...
Page 182: ......
Page 183: ...BIP LD2 T017 01 EP_ _ BIP LD2 T017 01 EP_ _ S4...
Page 184: ...www balluff com...
Page 191: ...5 1 BIP 1 2 3 BIP BIP 5 2 BIP BIP 5 www balluff com 9 BIP LD2 T017 01 EP_ _ EP_ _ S4...